Answer Posted / prashanth
1.Time consuming will be less.
2.Required strength will be obtaining.
3.Wastage of the materials will be reduced.
4.Project work will not get delay.
5.required shape of the structure will be obtain.
6.Quality of the structure can be maintain.
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is binding spacing of the rebars at lapping zones.
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
How to make a c++ program that converts any base to base 10?
IS code for Rolling Margin of steel
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What are some facts about concrete?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
Explain the water bound macadam roag
Explain what is the release of lien?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
I am called for interview from north east power plant .so, I need some interview question which may help me.
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
How to calculate the quantity of ingredients of M20 grade concrete?
how we check the thickness and line of ceiling plaster.