whats the necessary to correct the power factor using
capacitive banks in industries?

Answers were Sorted based on User's Feedback



whats the necessary to correct the power factor using capacitive banks in industries?..

Answer / monojit dutta

by improving the p.f the reactive power consumpion is
reduced and hence the kva consumption is reduced. thus for
the same KW loading the current drawal reduced. As a result
the size of conductor/cable required reduced and also the
total KVA/MVA demand reduced. Hence all the bulk consumer
are encourraged to improve their load p.f by imposing
rebate in their energy bills.

Is This Answer Correct ?    7 Yes 0 No

whats the necessary to correct the power factor using capacitive banks in industries?..

Answer / bala

In order to reduce the energy bills and to meet the load
condition it is necessary to correct powerfactor.

Is This Answer Correct ?    6 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

Please send specifications for 1000KVA dry type transformer or where I can get the specifications?

2 Answers   PSU,


What is use of reactor..how it is help ful in electrical system .....brief explain

1 Answers  


how steam converted into electricity in power plant

4 Answers  


Why r use in the tap changing x' mer.

2 Answers   L&T,


What happen to the transformer if the OLTC frequently used for lower and raise occured 50times daily?

0 Answers  






sir i am fresher.can you please tell me how can i get certificate of competency as electrical supervisor.

1 Answers   ONGC,


advantages & Disadvantages of Solar power system?

2 Answers  


In radial network the source is fed from 1 end both ends at central

0 Answers  


At which time Synchronous generator act as a Synchronous Condenser?

1 Answers  


what is the difference between thermal magnetic release and microprocessor based release breakers. what are the advantages of latter over the first one...

5 Answers   Jackson, Karthik Industries, McD BERL, TCS,


What are the test involved in DG auto synchronizing panel before in manufacturing place before dispatch.

2 Answers   L&T, TCS,


What is the main feature of v/f control?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)