What"s mean by water macadam road (WBM)?
Answers were Sorted based on User's Feedback
Answer / suresh
wbm means water bound mecadam road.it is the rural roads.60
and 40 mm coarse aggregate mixed with red gravel laid on
earth then binding with water pouring with heavy weight
roller compaction.
Is This Answer Correct ? | 18 Yes | 1 No |
how much cement is required for 3200 sq ft of roof
how to find hardness of water?why it should be determined?
what is differences between ferrock and concrete ?
Why did you choose this career?
why spacer in reinforcement?
What do you mean by TOLERANCE in steel
ratio of rcc 1:1.5:3 grade of concrete ,7days& 14&28 days after curing how much strength of compressive strength in rcc slab
How to calculate water cement ratio in mix desion
How do we calculate the weight of aggregates, sand and cement M 25 design mixfor 1 cum
which grades of concrete is used in mega structures and well known structures? please name the structures and show their grade of concrete.
what is the proportion of M200 &M300 grade concrete
1 Answers Karrm Infrastructure,
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.