What"s mean by water macadam road (WBM)?
Answers were Sorted based on User's Feedback
Answer / suresh
wbm means water bound mecadam road.it is the rural roads.60
and 40 mm coarse aggregate mixed with red gravel laid on
earth then binding with water pouring with heavy weight
roller compaction.
| Is This Answer Correct ? | 18 Yes | 1 No |
what is meant by geosyntahtic system
mean of NH4 pipe
12mm diameter iron bar having 1m length how much kg weighted ?
What is Paste :
Cement , sand , concrete ration in M30 Grade
difference between nominal mix and design mix difference between nominal size and actual size of brick,aggregate etc
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
What is the difference between face reinforcement and distribution bar in a concrete structure?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
how many time use of plywood shuttering and IS code
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
rimmer in pile foundation
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)