what"s the formula find the cement consumption for brick work
23 thick wall 1 m3?
Answer Posted / mohammed aijaz hussain
Volume of Dry Mortar = 35% of volume of Brickwork
Let the Cement Mortar Proportion be CM(1:4)
Volume of mortar required = 0.35 X 1 = 0.35 cu.m.
Cement required = 1/5 X 0.35 = 0.07 cu.m. = 2 bags
Sand required = 4/5 X 0.35 = 0.28 cu.m.
| Is This Answer Correct ? | 46 Yes | 22 No |
Post New Answer View All Answers
what is w/c ratio in dry lean concrete for m10 mix design
rimmer in pile foundation
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
What is the strength of cement?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
what is the percentage of silt in black cotton soil.?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
why does the most of civil engg is not intersted to going for teaching field?
Define What are the uses of alloys in daily life and how are alloys made?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
what's the formula for calculate pcc for matt(45mm aggregate)?