what"s the formula find the cement consumption for brick work
23 thick wall 1 m3?
Answer Posted / mohammed aijaz hussain
Volume of Dry Mortar = 35% of volume of Brickwork
Let the Cement Mortar Proportion be CM(1:4)
Volume of mortar required = 0.35 X 1 = 0.35 cu.m.
Cement required = 1/5 X 0.35 = 0.07 cu.m. = 2 bags
Sand required = 4/5 X 0.35 = 0.28 cu.m.
| Is This Answer Correct ? | 46 Yes | 22 No |
Post New Answer View All Answers
3. What are the disadvantages of your present job, things you do not like about it?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
Mention what are the composition of a landfill?
What is meaning of tlc
how many cement used in single story residential building per sqft
in plate load test what is the thickness of plate 20mm 5mm 50mm none
how to calculate the scour depth
What is the average density of soil?
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
why do we provide haunches in rcc box or underpasses?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?