when we conduct high voltage testing why milli amp. is
required?

Answers were Sorted based on User's Feedback



when we conduct high voltage testing why milli amp. is required?..

Answer / iamdon

Generally at high volatges we test the insulation level.
The insulation resistance is very high(order of Mohm).So
leakage current flowing is very small(order of milliampere).

Author:arbelectbit@yahoo.com

Is This Answer Correct ?    4 Yes 0 No

when we conduct high voltage testing why milli amp. is required?..

Answer / brijesh

you can allsosaid like this as ohm's low current is
inversli proposnal to the voltage

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is specific gravity of a battery if specific gravity increase/decrease,what will happen to the voltage/current of the battery

5 Answers   NTPC,


what is inrush curent.

5 Answers   BARC,


what are the basic concept to design a out door Substation?

1 Answers  


what is load cell? whrere its used ? how to measured?

2 Answers   Essar,


state the functions of different parts of star delta starter.

1 Answers  






effect of single phase transformer on full load current?

2 Answers  


Anybody tell me about modbus hex address of l&t trivector meter er300p??I want to read voltage,current,kwh etc via rs485...If anybody have a manual then send on my mail..Brijeshmodi18@gmail.Com

0 Answers  


when voltage increases current decreases & vice versa why it is so?

3 Answers  


29 Which of the following breaking method save energy? A regenerative breaking B plugging C dynamic breaking D none of above

1 Answers  


why a tester wont shock while testing the power in house

0 Answers   Tessolve,


why the efficiency of generator is more than the motor in case of swinburne's test????

1 Answers  


We are installing a 1.6 MVA transformer at our crusher plant and the feeder of HPSEBL is 2 km away at substaion . and a VCB is installed in the substaion which is 2 km away from transformer so we need another VCB near the transformer.

2 Answers   SCPL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)