Required Qty of Cement Mortor for 3"x3"x1' groove filling?
Answer Posted / s sambasiva naidu
if it is for wet morter the answer is 108 cub.inches
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What are the advantages of cad software’s?
What is the procedure of concealed plumbing in toilets?
what are RIB slabs explain about it
What is the difference between 53 grade and 43 grade cement
What is the usage of zoom command?
Explain moment of inertia?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is the largest concrete dam in the world?
150mm bricks size how many use 4.14 m3
How much cement will require for 1Rmt Skirting laying
how many spacers we need for 1 ton reinforcement? aprox.
Time required for curing of wall tiles before fixing
dialation means
Explain how you can turn off the display for dimension in CAD?
why development length = 50D . why not 100D