Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


WHAT HAPPENING TO TRANSFORMER????
i have the step down transformer rating 230/12v, power
rating something.,,, ok. suppose iam giving 12v to secondary
side,what will happen on primary side.,,,

Answers were Sorted based on User's Feedback



WHAT HAPPENING TO TRANSFORMER???? i have the step down transformer rating 230/12v, power rating s..

Answer / rahul ganthade

yes, it can be used as step up transformer also,provided
loading should not exceed the rated kVA

Is This Answer Correct ?    7 Yes 1 No

WHAT HAPPENING TO TRANSFORMER???? i have the step down transformer rating 230/12v, power rating s..

Answer / mk

if 230/12v Xmer if you provided 12v in Xmer then O/P
of Xmer will be 230v & it called as step up Xmer.

Is This Answer Correct ?    14 Yes 9 No

WHAT HAPPENING TO TRANSFORMER???? i have the step down transformer rating 230/12v, power rating s..

Answer / vincent

you will get 230v if 12v supplied was AC

Is This Answer Correct ?    5 Yes 0 No

WHAT HAPPENING TO TRANSFORMER???? i have the step down transformer rating 230/12v, power rating s..

Answer / r a m e s h

The design of transformer are rating in terms of insulation
of core & winding configurations
in 230v/12v transformer the primary winding(230v)
nearer to core & (12v)winding at outer layer
so it is not possible for to step up value to 12v to 230v

by input 230v ac in secondary site(12v)the winding
insulation burn up.
@Ramesh

Is This Answer Correct ?    3 Yes 0 No

WHAT HAPPENING TO TRANSFORMER???? i have the step down transformer rating 230/12v, power rating s..

Answer / raju.be10@gmail.com

Winding Depend Produced voltage of TRANSFORMER

Is This Answer Correct ?    1 Yes 0 No

WHAT HAPPENING TO TRANSFORMER???? i have the step down transformer rating 230/12v, power rating s..

Answer / mujeeb

THE TRANSFORMER SHOULD STEP UP THE VOLTAGE ,IF AND ONLY I
THE SECONDARY VOLTAGE IS AC ,THE INSULATION OF THE CORE
ALSO COES INTO PICTURE ,SO THE VOLTAGE WHICH IS AVAILABLE
WILL NOT EQUAL TO 230V AC.BECAUSE THE VOLATGE 12V HAS TO
BEE FEED TO THE PRIMARY WILL HAVE INULATION LESS THAN THE
PRIMARY SO TRANSFORMER GETS HEATED IF U DO IT FOR LONGER
TIME........

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

The knee point of a current transformer is normally unique and known.So why in the nameplate of a CT they put the minimum value like this Vk> 400v.

0 Answers  


If 11 KV breaker on the primary side of a 11 KV/3.3 KV 12.5 MVA transformer can be installed at a distance of 1000 mtrs through a 11 KV cable. If no what are the probable reasons.

1 Answers  


sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.

0 Answers  


Why in Digital Megger for finding Insulation resistance,-ve is applied to core or conductor and +ve is applied to ground.

1 Answers   ACC,


How to get a multiplier in 11kv energy meter?

1 Answers  


in dc suppy frequency is zero why? if dc frequency is zero how to exist dc transients and ac transients

0 Answers   Siemens,


I have 320 Kva DG Set his KWh running is 77 , how i can calculate into electrical unit .

2 Answers   Anuj Enterprises, Schneider,


what are the various types of towers used in transmission line

12 Answers   Power Grid, UltraTech,


why secondary terminal of current transformer should not be open circuited?

4 Answers   ABB,


why various test are performed on electrical panels & power cables before commissioning on site & what are these test???

0 Answers   Lavasa,


why we use stones or rock pieces in transformer area?

10 Answers  


What is the difference between MCCB,ELCB,RCB & MCB

2 Answers   Bhel, HCL, HPL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)