Answer / karthick
load factor-->avg load over a certain period/max load over
the same period of a power plant
sensible heat factor------>sensible heat/total heat
total heat-->latent heat + sensible heat
| Is This Answer Correct ? | 4 Yes | 0 No |
What is cutt off ratio in IC Engines.give proper defination.
5 Answers Essar, Hyundai, Jindal Steel and Power, L&T,
Give the safety precaution when working in a high place.
Properties of F.O. the cause damage on auxiliary boiler.
sir i need section engineer test papers
Does the position of a chicken egg affect the amount of weight it can withstand?
Explain difference between modulus of resilience and modulus of rigidity ?
sir i am working in CIM Technologies , AS DESIGN ENGINEER, I WANT TO PREPARER FOR INTERVIEW TO THE DESIGN PLEASE SUGGEST HOW TO PREPARE FOR INTERVIEW
what is difference between pressure and stress?
Explain the importance of thermodynamics laws in mechanical engineering?
How to find bearing outer dia with bearing number
how gravity filling machine is designed?
How does a coal power station produce electricity?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)