what is the prosses for getting of 33kv licence (i have completed my engineering degree & working in 33kv substation for contract basis )????
1903if field breaker of generator is closed prior to its rated speed on a power generating unit. what will be the effect on generator, unit transformer and starting transformer.
1712what is the Transmission line differential protection and why differential protection also have backup Line Distance Protection ?
1 2557I have done my m.tech in electrical engg discipline. Can any one please suggest me how should I prepare for getting into phd in iit or nit.How should I prepare for getting into lecturership
1656how to i get B licence,i am completed BE electircal and electronics engineering.i want to konw the proceduure to get b licence
1706What is the criteria for selecting the voltage classes of an AC Induction Motor.The KW rating above/below which ht/lt selection is made may be provided in details.
DAE,
1612Post New Electrical Engineering Questions
I completed iti in2004 I was worked in A grade contractor can I get c licence
Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason
why zero sequence impedance measurement is not applicable for single phase GT
we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?
what is the difference between "Rotary bypass isolation switch and Normal bypass switch" pls share indepth techs?
why sielent pole is used only in hydro generators and not in turbo generators
What is the phase relationship between the primary and secondary voltages of a transformer?
What are the types of instrument transformer?
What is the BS(British Standard)code for 11kv motor
some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?
rajha power sector details
How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?
How to checked frequency drive output voltages?
what is fault level of power system ?
what is the illumination level required for child play area?