If u take a kWh reading in 11 kV HT and 440 LV side at same time in yesterday today , then why LT consumed units 3-4℅ high as compared to HT units
1 1641From past few months I am getting lagging pf even though sufficient capacitors used in circuit. Where is the problem pls answer
922dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
961Post New Electrical Engineering Questions
What is the maximum percentage voltage drop (vd%)for a motor control center
What is oscillator circuit?
Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.
Hi I'm doing my MBA(3rd semester).I applied for the post of ET conducted by BHEL the last year.I cleared the written and lost in personal interview.Again I wrote the exam this time and cleared the written n yet to take the personal interview.Shall I disclose in the interview about my studies.What shall i say if they ask about my change from studies to job
In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?
What is an 86-P or an 86-A trip
Why it is possible to use PWM with a STATCOM and not with a conventional TCR based SVC
hey guys i scored 910 on GRE and 67 on TOEFL respectively.I have an aggregate of about 74%in my B tech.For which colleges should i apply for an MS program in electrical engineering.I am looking for colleges in NJ,SC,NC,GEORGIA, NY. Please reply with a good response.....
What are the temperature elements?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
i need previous entrence exam papers of nhpc.
What is the lifetime of a Thyristor? Is there a recommended lifetime for thyristors after which they should be replaced?
how to calculate the step resistance for slipring induction motor,how you deside the no of step for that?
List few applications of d.c series motor?