Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
1590For DG or Transformer body earthing, is it necessary to terminate the earth bus to earth pit directly? If not terminated to earth pit directly in earth pit and connected to any common bus strip which ultimately connects to earth pit, what will be the pros and cons?
1 2067If only R Phase is connected in 2 pole elcb, n is not connected than it will work or not in ground fault.
1436We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.
1525we have amp, voltage, kw, length detail then how to calculte copper & alluminium size of conductor of 3-phase induction motor
1462Post New Electrical Engineering Questions
How to apply 'c' license and also explain what is difference between 'c' and 'b'license.i am also working in one of the private company.i have finished my diploma in 2014 .i have already finished in ITI electrician course.....
What test must you do before powering up a circuit that you have been working on?
my diploma certificate in my higher education college
upto how many load can v connect to stabilizer which is used for tv
What is the function of under voltage release ?
What are the parameters of water ( Water quality )to be monitored in Centralised HVAC ( water cooler chillers )
Is there any Electrical supervisor license which gives permit to work whole India rather than individual state??
what is effect of leading power facter on the system and billing
is there any lightning by passer is arranged in ship like buildings?
How to configure the drives in PLC, through Profibus commnication. And to how to address it?
Why field rheostat is kept in minimum position while armature rheostat at maximum position?
Can XLPE/SWB/PVC (P3) 7C X 2.5mm2 be replaced by Can XLPE/SWB/PVC (P2) 7C X 2.5mm2??? P3 vs P2
how to fit 3 HP crompton gear motor with conveyor with the use of staring delta starter or ordinary starter?
How do apply electrical 'c'license......pls advice
What is clock position of Transformer?what are the clock positions are there?and what is different of them?