Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
1555For DG or Transformer body earthing, is it necessary to terminate the earth bus to earth pit directly? If not terminated to earth pit directly in earth pit and connected to any common bus strip which ultimately connects to earth pit, what will be the pros and cons?
1 2004If only R Phase is connected in 2 pole elcb, n is not connected than it will work or not in ground fault.
1398We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.
1474we have amp, voltage, kw, length detail then how to calculte copper & alluminium size of conductor of 3-phase induction motor
1411Post New Electrical Engineering Questions
why different series of vfds (like allenbradley)are used in industry ?
What is the difference in calculating size of AC cables compared to calculating size of DC Cables? Usually DC Cables are larger than AC Cables although they have the same ampacity. Why is it?
How we can defined theecopper cable size if we know the aluminium cable size?
What does the term “voltage regulation” means?
what is the difference between ac motor and dc generator
what will happen if there is a voltage leakage or current leakage in an electrical train
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
hai now i am working as a electrical design engineer in construction field can i get a job in oil and gass field or power plant project as a electrical design engineer?
Explain and give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?
How PSV sizing being done
why the field winding in dc motor is not short circuited eventhough dc supply is applied across the winding
What are the advantages of hydropower?
State superposition theorem?
if the armature current in a dc generator is ac ( sinusoidal ) why doesnt the sjhape af armature mmf a sinusoidal (ni) ? armature mmf in case of a dc machine is triangular.
explain supply side and demand side energy management with advantages & disadvantages