I have experienced electrical maintenance HT ,but I completed be ECE ....can I apply c license or not ???? Pls help me friend s...
1542i need to calculate high voltage line power factor daily basics but there is meter reading kwh and kvah while calculating power factor kwh/kvah formula was right. for examble there is point c=13kwh c=1.8 lag c=1.2 lead and c=14.5kvah like that i know that p.f =kwh/kvah but c=1.8lag kvarh and c=1.2lead kvarh points i dont know if u know please reply
1 2629In Dyn11 power transformer if any one of the 3 phases connected to earth in star connected side then please explain effect of the current flow in delta connected side of transformer.(In this case if one phase is shorted to ground in star connected side then we observe the current flow in two phases only not three phases in delta connected primary side. Please explain why it is so?)
1737How to Calculate The Neutral Earth flat design calculation for the Synchronised generator (Gen 1-650Kva, Gen 2-725Kva
1612Post New Electrical Engineering Questions
i've iocl interview.. if you know the interview process please give me information..
What are approaches to tackle sedimentation problem of reservoir?
Pl.brief me any electrical major fault you have rectified.
Differentiate between digital phase converter and ordinary phase converter.
How to select a transformer group to connect a 0,433 KV generation with 33 KV grid in bi directional flow of current
Inverter. converter. Ups.MCB.solar.alternators. motors.
What is the function of probe in cro?
how test transfomer(3 phase75kva) by megger
can anyone explain the star-delta motor control wiring ,which wire go where and how they operate?
what is the diff. between x'mer , isolation x'mer & ultra-isolation x'mer ?????????????
What are the advantages and disadvantages of the dc motors?
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
List of equipments required foe industrial repair lab.
what work will do diffrential realay DG set
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.