1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX? 2.WHAT IS MEANT BY STRUCTURAL DESIGN? 3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER? 4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM THE LOAD COMBINATION? 5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP? 6.FULL FORM OF SPT & SMB? 7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT? 8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY? 9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND REMEDIAL MEASURES? 10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH? 11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB? 12.WHAT IS MEANT BY GANTRY GIRDER? 13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB? 14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT LENGTH? 15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR SHUTTERING?
3 14027A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?
1 37571. if only 1 slab of a floor get sagged, how could be it repaired? 2. if any footing gives the cube result, after 28 days less than 16 n/mm2 in spite of 20 n/mm2 what are the remedies ?
3 8092Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? Regards,
45 38038What is the ratio of cement ,sand, and aggregate to be used in M20 grade of concrete when excavating 200 x 200 x 200 mm of sand from soil
4 10066What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)
7 21391RCC colums of 15"X9" each, roof height 10.5'ft, total pillars 12 nons. Span between pillar to pillar is 14/20/20 length wise and 17/14 width wise. Total Slab area 2400 sft and plinth area is 1900 sft. beams are 12"X12". kindly calculate load factor per sqft.
2 20605i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Ecil,
3193how to find the percentage for minimum reinforcements as per IS:456 for beam , column, slabs.??
1 7052Post New Civil Engineering Questions
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
about higyway engineering
When was the first motorway built in england?
how much required strength of cement concrete bricks(size 230x115x75mm)
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
What is the difference between Fe 500, Fe 500 D and Fe 515.
What quantity of 1.0 m3 bricks required?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
What is GSB gradation
How to calculate plastering for elevated water storage tank
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Formula for calculation volume of essentric footing
what is floating slab foundation?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.