How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
1 2136how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
CCCL,
1 2796HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
1 4743What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
1 2277How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance
2 5585How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 4989For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the weight of sand and aggregate
4 11434Post New Civil Engineering Questions
how can we calculate steel value, depending on load
please send me bhel questions on rupesh.017@rediffmail.com
what is the difference between replacement of cement by groundnut shell ash
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
plz.show development and anchorage length in simple diagram.
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Technical Question of Civil Engineering
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
pls mail some more tecnical qustions at msaranya2610@gmail.com
Which is the latest version of solidsworks?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.