pls can some one tell me details of coloumn shuttering like at what distance the supports should be palace and no. of supports
1 5057why red bricks & cinders used in toilet sunken filling. if coarse aggreate used wat the probelem
2 25654What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
2342how to calculate the circular beam reinforcement.its a helipad beam. Dia of bar 25 mm. if its consider any elongation?
1 3683what the length we reduce for 45deg. bend for each side bend of bar.we know the 2d in case of 90 deg. bend.give clarification also?
1 4587Post New Civil Engineering Questions
what is meant by csr in foundation? what is sbc?what is meant by contour line?
What is meant by autocad?
What is thumb rule for deep trench excavation
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
What is costing in 100squre feet bricks
What is the standard volume of pharma in cub ft
How do we test on design and style in a software?
Forces in a Shear Wall are in plane or out of plane ?
How to calculate steel for beam slab and column
what pressure the NP2 class RCC pipe can sustain?
What is the absolute pressure scale?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How is improve my knowledge in construction industries....
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What are the main reasons for conducting pull-out tests for soil nails?