i Have Completed a Intermediate Vocational (Construction technology) with Bridge course ,iam elegible to join in Institute of Surveyors(india).
3 7339Post New Civil Engineering Questions
why we use aggregate,sand with cement in concrete?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
How foundation is designed, Column design and beam design
PL.tell me about civil engineering questions with answer
what is high type road and low type roads
The 4 main factors to start a construction project are––
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
2nd and 4rt angle elevation used in which country ?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
How to arrive dry volume of concrete (1.52 to 1.57) ?
How many are the types of joints?
How many cum of 9.5mm stone in 1 ton ?
What does a construction cost covers and what does not?