Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) we are using three transformer 33000/430 vac for three separet block.all three transformer have three LT panel separetly. can be Interconnected all three panel through bus coupler. this is permissable or not by state electricity board.
4 6552How much ampere rating on LT side of distribution transformer and also on HT side of 200KVA transformer
ABB,
2 12247How to solve the problem of low voltage at consumer end in distribution system if one phase come low voltage of transformer
ABB,
1 3823
What is evaporator & condencer & compressor
sir, i need some help by you. sir i want to know there are any industry that give six month training on the basis of entrance examination. sir if there are any .pls send me ans on my email-id sk12005@rediffmail.com pls.
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
Brushes are placed at magnetically neutral axis,when brushes reach that point,the armature conductor gets shorted,but it can be seen that the dc supply is also shorted,wont that get damage? help me plz
Why front mounted CT polarities are always towards breaker?
i need modal Q. paper of junior enjineer for 1/2009 rrb ajmer exam cat no. 11 jell electrical thenkyou
What are the measures taken to save the aircraft from lightning?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Explain the fashion forecasting
Do you know what is load?
WANTCONTACT NUMBER & EMAIL/ WEBSITE TO CONTACT THE SECRETARY,MADHYA PRADESH LICENSING BOARD(ELECTRICAL),K- BLOCK,3RD FLOOR,SATPOODA BHAWAN,BHOPAL
what is integration,optimization of gsm corenetwork in practice?
what is temperature compensation?
How addressable fire systems work? Pl. send details with architect.(Loop), also send details regarding Gas system. Pl. help me.Thanks
what is the need of starter in tube light and what type of starter is used in that?