Requirement Management (61)
Risk Analysis (22)
Estimation Analysis (14)
Planning & Integration (15) who are the stake holders in identifying the risk analysis of pure software product development
IBM,
2222what are the methods used to evaluate the risk analysis, is there any historic support to calculate risk analysis
IBM,
2051
how to track the requirements if all ready it is available for that product
Why your company can not complete the project? On your website stand, that you are specialist for Typo3! Do you know sure the website http://experience-drcsystems.de.
what is the different between all software models
Host and Agent are the component associated with which tool?
what are the existing tools for SW planning
what are the responsibilities of integrator
Explain waterfall model? what will the testing team do in Requirement phase in this model and what happens in design phase?
Why is it that a single, all – encompassing metric cannot be developed for programme complexity or programme quality?
Lines of code (LOC) and function point counts (FPC) are two measures of the size of a system. Explain the advantages and disadvantages of using these two metrics for measuring systems.
what are the methods used to evaluate the risk analysis, is there any historic support to calculate risk analysis
explain the basic QA plan to co-op with development plan for effective delivery of the product
what is regression testing, how effectively the QA lead / manager can implement this for product qualification
what are the basic rules have to be followed for successful resource planning
in SW development who will be the owner of the perticular requirement and what is his responsibilities
Is it normal in your company, that you do not pay penalty, if that is agreed in contract?