Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much binding wire is required for one tone reinforcement ?

Answer Posted / sreenath

its normaly 6-8 for slabs and 5-7 for beams and columns

Is This Answer Correct ?    3 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to find ssm in foundation?

1946


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

2107


Mention different types of roof systems?

1181


how much used soil in 1 brick of standard size?

2081


specifications of fe500 steel

3543


types of survey and levelling instrument ?

1876


How do you calculate the power of a centrifugal pump?

1160


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2287


How to find out slope footing concrete

2952


what is mean by c32/40s concrete class

1958


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2599


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

2082


What is OSHA compliance?

1149


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2169


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2541