Shall we use Dyn1 transformer in place of Dyn11 for motor application as a distribution transformer
1 2923Can 33kva/415v transformer be run underground? If the answer is yes why and if the answer is no why?
1588We have 11kV/110V three phase indoor potential transformer in 66/11kV Sub-station, where the failure of PT is frequently happening and the rating of the PT is 0.2 class accuracy, with primary star and seconday (two cores) star connected. Some experts has suggested to not to connect the PT Primary neutral to the ground because when transformer neutal NCT connection is loose; the faulty current will flow through the PT primary neutral, resulting into failure of PT. My question is: Is it necessary to remove the primary neutral connection of the PT from ground? if not, what would be the reason for failure of PT. Please guide me.
2 3757Whether amorphous core transformer is available in India?.If available then up to what rating of voltage and KVA?.
1746Our transformer capacity is 500kva & voltage ratio is 11kv/433v step down tf.Now i need to know if my input voltage is 10500v and what would be the secondary side voltage i.e output voltage ?
3 4908
Difference between PowerPlay transformer and power play reports?
All tape of electrical questions Answers tape of motor transformer e.o.t crane
If one tertiary phase i.e. R,Y or B is earthed of a loaded type tertiary delta connected (Without load)of a power auto transformer, what is its advantage/disadvantage?
what is R Core Transformer. how it differs from normal transformers. dont search in net and post the answer.
Draw the line diagram of diffretial relay connected to transformer?
How to select the earthing transformer,for DELTA TO DELTA TRANSFORMER OR ALTERNATOR SIDE.Pls post your answers and calculation.
Why Transformer Neutral having one earth pit ( more earth electrode resistance) whereas body have many earth pit ( less earth electrode resistance)?
how we arrange the hv side with delta connection in case 33/11kv of transformer.
what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end
i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400
what is the effect of connecting three phase supply lines to three phase auto transformer output terminals through a fuse of 10Amp and a circuit breaker (MCB). Is this connection permanently destroy the transformer?
How is the percentage impedence of a transformer fixed at design stage???
How a capacitor discharge weld power supply works? what is the use of a pulse transformer?
what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?
what r the checklist while installing 500 kva transformer