Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Can neutral line also be use as a earthting for
distribution transformer, or we need separate earthing pit
forh the transformer?



Can neutral line also be use as a earthting for distribution transformer, or we need separate eart..

Answer / ullas

in the distribution transformer the secondary star side
common point is earthed and taken it as a neutral terminal.
this neutral is earthed 4 place i one mile., in order to
keep the potential as zero volt..
there are so many distribution systems in india.
take the case of kerala, my state.
here we are using the TNCS System.
here phase line and neutral line are given to the consumer
by the supplier. the consumer shall provide an earth pit
for earthing his equipments.
in tamilnadu the TNEB provide additional earth line with
phase and neutral.

Is This Answer Correct ?    7 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is the power rate of power transformer?

1 Answers  


what is lrs tank water resistance.

0 Answers  


WHAT IS MEANT BY INSULATION CLEARANCE IN VACCUM?

0 Answers  


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

0 Answers  


why in some trains in India Electric equipment such as Fans , tube light not work until locomotive or engine is attached to the train ??

1 Answers  


Q) Write VBscript code along with QTPscript code in QTP tool for below scenario 1. Launch yahoo site(i know) 2. Do loogin(i know) 3.Click inbox link(i know) 4.Go to every page of mail box and count no.of read mails and no.of unread mails(i know) 5.Store page numbers, read mail count and unread mail count in a new excel file sheet 6.Create 10 types of graphs on that data 7.Do logout and close site(i know) 8.Save new excel files with graph

0 Answers  


list the advantages of RCCB over other circuit breakers?

0 Answers  


In a circuit the power factor was leading what will happen?

2 Answers  


can we step up dc power using transformer?

15 Answers  


why protection and metering CT's are always connected in star why not in delta?

5 Answers   Reliance,


HOW WE CHOOSE EARTH'S POTENTIAL AS ZERO V?

0 Answers  


What is the possible cause for failure of lightning arrestors in outdoor substation under normal condition

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)