what is the Connected Load (kW) or Contract Demand (kVA)of
mahindra nasik plant??
No Answer is Posted For this Question
Be the First to Post Answer
why we use perllel conection system in the wiring?
why three phase system is not preferred in aircrafts power cckts if yes than explain reasons?
For 35 HP motor how much amount of capacitor should be on in kvr to reduce the current bill
Why sometime i receive GCU fault /Excitation voltage loss in my Generator Synch Panel .
please tell me formula of 3 phase induction motor under condition{1]when we 3 phase motor starts without load in star or delta connection?thanks
Why did lightening arrestor solid copper rod head is sharp on mobile tower top?
what are the necessary basic electrical topics to learn for mechanical engineer to deal practical problems.
what is difrent between earthing and ground
how to calculate busbar size? ex:11000kva main what is the busbar size ?and how to select the correct one
why all transformer colour is same?
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
what is the principle to generate energy from water or coal, plz define the step by step how & when electricity energy start from resource area to ours home meter & separate & how meter read the voltage or current?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)