How can you test the vector group of power transformers?
Answers were Sorted based on User's Feedback
Answer / thowsif_emerson_csm team
A Vector group is the International Electrotechnical
Commission (IEC) method of categorizing the primary and
secondary winding configurations of three-phase
transformers. Within a polyphase system power transformer
it indicates the windings configurations and the difference
in phase angle between them.[1]
The phase windings of a polyphase transformer can be
connected together internally in different configurations,
depending on what characteristics are needed from the
transformer. For example, in a three-phase power system, it
may be necessary to connect a three-wire system to a four-
wire system, or vice versa. Because of this, transformers
are manufactured with a variety of winding configurations
to meet these requirements.
For More Information Log On to:-
http://en.wikipedia.org/wiki/Vector_group
| Is This Answer Correct ? | 2 Yes | 0 No |
(2u-2n)+(2n-1W) = (1U-1W)
( 2v-1W ) = (2w-1W)
( 1V-2v ) < (1V-2w)
( 1U-2v ) = (1U - 2w)
In DYn11 connect 1U & 2u .and apply the 3 phase 415 v ac to
HV side. Check for the above condition .if its ok then
group is DYN11.
| Is This Answer Correct ? | 2 Yes | 1 No |
What are series and parallel isolators?
what is meant by frequency ?
sugest any typical project ?
For polarity test on a 11/3.3kV 2.5MVA delta-star Unit Auxiliary transformer,415V 3-phase supply was applied at the HV. Connection between Aa was made with a 2.5mm cable. As soon as power was switched on the cable caught fire and burnt. This test was then abandoned. It is noteworthy to say that a similar cable was also used in a similar transformer for the same. The cable did not burn and test was successfully completed with good result. What is wrong? Please, help me out.
i want to apper for apgenco or aptransco or related can any one sugest me where can i get previous papers of thouse exams
you are a electrical student, why are you coming for software job.
in thermal power plant the steam produced is made to cool after falling on the turbine blades. my question is why this is done while the same is needed to heat up again. "jab pani ko wapis garam hi karna hai to thanda kyu karte hai"
when qty of cable being purchased is not sufficient according to the standard,what should the inspector do to ensure its quality according to the standard?
Application of statically induced emf
Why does the speed regulating system adopting I controller have no steady-state error? In this single closed-loop speed regulating system, when the input of the I controller Un=0, what is the output voltage of the regulator? What factors do the output voltage depend on?
can you show me the components inside a air circuit breaker with connection diagram?
yesterday i am using my laptop by plugging power supply also battery was working properly after while i unplugged AC power source ,using my battery i played car game (use much power) after that the battery finished the charge and it closed my PC. after that my battery not charge (when unplug automatically PC will turn off)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)