what is Vx-EHT(RED) complex chemical compound.
Answer / d badrinarayanan
This is used to achieve better soil resistivity in order to
get effective and optimum earthing system design
particularly in dry area.However, reacts with iron material
faster and increase corrosion rate which is a drawback.
| Is This Answer Correct ? | 0 Yes | 0 No |
Which type of pneumatic control valve is used mostly Either Air to Open r Air to close the value And guys I need reason for your reason
What does the catalytic converter on an automobile really do?
what are lubricants using in compression.
How can you control the ph level in our cooling water with respect to ammonia contamination?
How does a cyclone separator work?
which thing is responsible for making petroleum?
What is condensate lift?
Question 36 - For a mixture of benzene (B), toluene (T) and xylene (X), the equation applies where x for B, T and X will sum up to 1. The equation of x for each component is x = (L / V + 1) (F) / (L / V + K). The data of F for each component are : 0.5 for B, 0.35 for T, 0.15 for X. The data of K for each component are : 1.98 for B, 0.76 for T, 0.24 for X. When x for B + x for T + x for X = 1, find the values of (a) L / V; (b) x for each component of B, T, X respectively. You may use Excel program - Data : What-If-Analysis for Goal Seek to perform the iterative calculations.
How can metals be removed from aqueous waste streams?
What are some common problems associated with dilute phase pneumatic conveying?
What is control valve ?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.3 : (a) In the M / M / 1 queue that happens with randomness, let State 0 = the queue and server are empty, State 1 = the server is in use and the queue is empty, State 2 = the server is in use and 1 is in the queue, State 3 = the server is in use and 2 in the queue. Let P (0) = probability of State 0, P (1) = probability of State 1, P (2) = probability of State 2, P (3) = probability of State 3 and so on. If c = constant, P (1) = c P (0), P (2) = c [ c P (0) ], P (3) = c { c [ c P (0) ] }, write an equation that involves P (N), P (N + 1) and c. (b) Let L = market price of risk, r = riskless rate, m = expected return, s = volatility. Given that L = (m - r) / s related to oil prices, expected return = 12 %, s = 20 %, riskless rate = 8 %, calculate the market price of risk.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)