Where we give genset o/p in home & industrial
applications ?
cleat wiring system is used at
TRANAFORMER RATING 500 KVA,33KV/433, SECONDARY SIDE SWITCHED ON ONLY CAPACITOR LOAD 140 AMS, PRIMARY SIDE HOW MUCH VOLTS INCREASE?
What should the transformer connection of a 11/220 kV step up and 66/11 kV step down transformer ?
I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?
Can anybody just suggest about the scope of Electrical design with ETAP software?Just guide me?
what is phase voltage phase current line current and their usage? provide diagram
On what basis do you decide the ONAN (Oil Natural air natural) or Dry type transformer for a project?
What are the factor to be consider for CT selection in 132kV substation?
1.what is the reason for transformer and lightning arrester blast in 33kv system
how dose servo motor works
State four criteria's for selection of site for nuclear power station.
while doing the excitation current test on power transformer what is the value of voltage to be applied? Nomonal rated voltage or 10% of rated voltage? Is it necessary to apply on high voltage side?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)