while testing a bug has been found and reported but it was not
fixed and delivered to the client what will be the effect on
it?
Answer / karunakar reddy
Depending up on the priorty of of the bug,
(1) if it is a "High priorty bug" means effecting the
functonality of the applicationn ,then the developers have
to fix it with in no time.
(2) If it is a "Low Priority bug", means not effecting the
application then it has to be fixed in the next iteration
or in no time.
Is This Answer Correct ? | 5 Yes | 0 No |
What were your testing responsibilities at your previous employer?
What is the term for decomposing a software program so that latent design information can be extracted? 1. Reengineering 2. Regression 3. Restructuring 4. Reusability 5. Reverse engineering
wht is the diff b/w functional testing and intehration testing
what would be the test plan for agile testing??
Explain operational testing?
How the 2 wings and body of the butterfly model of test development is represented?
How u r managing the staff unavailability?
what is port testing
Please some one answer these Q's 1.Modules in Pension Domains ? 2.What Should we Test on Pension Domain.? Thanks in Advance Stewie
What does black-box testing mean at the unit, integration, and system levels?
What are different SCSI command phases?
How you find the performance of a web application by looking at the values of ?Response Time? and ?Pages Per Second??