Meaning of CTPT ,how it works &how it measures the reading
on trivecter meter,&what is trivecter meter
Answer / lokesh ranjith
ctpt= current transformer & potential transformer
CT connected in series with the circuit & pt connected in
parallel to trivector meter
trivector meter is metering device which reads all
parameter of electrical devices like
KW,KVA,KVAR,KVARH,PF,I,V,etc
| Is This Answer Correct ? | 78 Yes | 5 No |
anyone please send transformer parameter design formulas & details of tap changer ? plz i have interview this week its more helpful for me ?
how on load transformer is chnage the Tapping ?
how maney type tempereture measurement ?
Hi, My question is our total motor load is 55 kw.so what cable size required for main supply. Please reply
How do you maintain the batteries for generators, what is the daily maintenance of a generator?
What is the meaning of capacity of a 63 Amps TPN MCB? Is it the per phase capacity or the totol capacity?
Generally In transformer Tap Changer on HT side, but I have seen in 66KV side in 220/66 KV, 100 MVA, Areva make transformer. Why ?
Why do we need interlocking in a HT metering or Ring main unit switchgear?
How to calculate HV Cable Sizing & what are the factors to be considered for selection?.
WHAT IS RETARDATION TEST IN DC MACHINES?
what is the work of trip circuit supervision relay?
If you don’t have coal, salt and copper, then how would you earth your connection temporarily at a camp site.?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)