What are the stages in the Test Development Life Cycle?
Answers were Sorted based on User's Feedback
Answer / suman
1.test plan
2.test design
3.test execution
4.track and management
| Is This Answer Correct ? | 10 Yes | 2 No |
Answer / ramapavithra s
1. Preparation of Testplan
2. Design your test cases
3. Prepare testdata and test procedure
4. Execute the testcases as per the test procedure
5. Prepare the defect report
6. Regression test after verifing defect fix
| Is This Answer Correct ? | 5 Yes | 2 No |
Answer / aa
Test Development Life Cycle:::
1) Test Plan
2) Test Scenario
3) Test Case Writing
4) Test Case Execution
5) Bug Reporting
6) Bug Tracking
7) Close
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / rajnikanth
1) Test Plan
2) Test Repository
3) Test Results
| Is This Answer Correct ? | 3 Yes | 4 No |
what is the difference b/w system testing & functional testing ?
what is the difference between Test-bed, Test-lab & Test-environment ? explain it briefly ?
what is difference between defect tracking and bugs tracking
On what basis is the Acceptance plan prepared?
3. A bug report is a: a. A collection of independent, reusable test cases. b. A technical document that describes the various symptoms or failure modes associated with a single bug. c. A deliverable that details the strategic approach to a testing effort d. A & B
In Risk, What is the difference between mitigation and contigency plan in risk.
what is test condition? what is test scenario?
What is diff between Load testing Stress testing?
which is the most important test case on the login page ?
what is test harness and testability?
What is the difference between SIT and IST?
A good url for testing concepts.....