M20 Grade ratio?
M30 Grade ratio?
M40 Grade ratio ?
Answers were Sorted based on User's Feedback
Answer / p.senthil nathan
M2o Grade - 1:1.5:3
M30 Grade& M40 Grade - Normaly We Used Disign Mix.
| Is This Answer Correct ? | 22 Yes | 3 No |
Answer / lakshmi
M7.5 - 1:4:8
M10 - 1:3:6
M15 - 1:2:4
M20 - 1:1.5:3
M25 - 1:1:2
M30 - design mix
| Is This Answer Correct ? | 20 Yes | 1 No |
Answer / dinesh kumar.t
m20 grade -1:1.5:3
m30 grade -Design mix
m40 grade -Design mix
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / viji.n.b
M20 - 1:1.5:3
M30 Grade& M40 Grade - Normaly We Used Disign Mix.
| Is This Answer Correct ? | 11 Yes | 4 No |
Answer / pravin deshpande
Higher grade of concrete should be done only with Mix Design
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / teja singh
M15(1:2:4), M20(1:1.5:3), M25(1:1:2), M30 is design mix
| Is This Answer Correct ? | 7 Yes | 0 No |
M15 - 1:2:4
M20 - design mix as well as nominal mix,and the nominal
mix ratio is(1:1.5:3)
M25 - design mix as well as nominal mix,and the nominal
mix ratio is-(1:1:2)
M30 - design mix
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / shalu verma
THERE ARE TWO TYPES OF MIXES:-
1-NOMINAL MIX
2-DESIGN MIX
1-NOMINAL MIX < M30 -ITS ALSO CALLED NOMINAL CONCRETE
2-DESIGN MIX >= M30 - ITS ALSO CALLED CONTROLLED CONCRETE.
SO, M20 IS A NOMINAL MIX AND ITS RATIO IS 1:1.5:3 AND ITS
STRENGHT IS 20 N/MM2.
M30 & M40 ARE DESIGN MIX AND ITS HAS NOT ANY RATIO THESE
ARE MEASURED BY THERE STRENGHT WHICH ARE 30 N/MM2 AND
40 N/MM2 RESPECTIVLY.
| Is This Answer Correct ? | 9 Yes | 5 No |
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
1 m^ 3 of concrete 150 x150 mm of spacing of required of steel ?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
What is an inverted beam??
what is thumb rule for calculating the size of ISMB required for a particular length of span
The designs required to construct a building are ––
What are the RISKS during the project construction?
what"s the formula find the cement consumption for brick work 12 thick wall 1 m2?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)