Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I have 1010 KVA Generator when i run the DG set for 5 to 6
hours the couplling (couplling joint in between engine &
alternator) bolts are getting loose what is the reason &
what is the remedy over this??????????

Answers were Sorted based on User's Feedback



I have 1010 KVA Generator when i run the DG set for 5 to 6 hours the couplling (couplling joint in..

Answer / cs reddy

Bolts are getting loose due to Vibration.
Vibrations may be due to :
a) Misallignment.
b) Improper foundation.
c) Improper Mass Balancing.

Is This Answer Correct ?    10 Yes 1 No

I have 1010 KVA Generator when i run the DG set for 5 to 6 hours the couplling (couplling joint in..

Answer / manoj saah

Coupling Misalligment may be major reason.

So do allignment by using Dial Gauge and clearance should
0.05 mm.

Is This Answer Correct ?    2 Yes 1 No

I have 1010 KVA Generator when i run the DG set for 5 to 6 hours the couplling (couplling joint in..

Answer / girish

Vibration is a main reason
1. Reduce vibration using vibration isolating mounts
2. use flexble coupling with lock nuts

Is This Answer Correct ?    1 Yes 0 No

I have 1010 KVA Generator when i run the DG set for 5 to 6 hours the couplling (couplling joint in..

Answer / rakshit

dumb people .... they have specified 1010 KVA ... which is
very high capacity.... high shear force exists if proper
rated engine is not coupled to generator ,,,, due to high
shear force.. wear in coupling.. wear in coupling... loose
studs... .. also greater vibrations is the cause

Is This Answer Correct ?    1 Yes 0 No

I have 1010 KVA Generator when i run the DG set for 5 to 6 hours the couplling (couplling joint in..

Answer / faisalabad

you may use self locking nut as well as suitable grate lock tight according bolts specfication

Is This Answer Correct ?    0 Yes 0 No

I have 1010 KVA Generator when i run the DG set for 5 to 6 hours the couplling (couplling joint in..

Answer / pavan

Use lock nuts. Because vibrations are unavoidable (but can
only be minimized), using lock nuts is always safe.

Is This Answer Correct ?    0 Yes 1 No

I have 1010 KVA Generator when i run the DG set for 5 to 6 hours the couplling (couplling joint in..

Answer / nagarajan

I Think u can make use of pins in the nuts at specified
tight point of bolt.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Mechanical Engineering Interview Questions

What is the purpose of gravity disc in centrifugal purifier?

1 Answers   Auburn, RRB,


800A bus-coupler system

1 Answers   PCEL,


what is the Tensile strength of M6 Screw

1 Answers  


water balance calculation for 1X500 tpd DRI plant?

0 Answers   NBVL,


What are the most immediate challenges of this position that need to be addressed in the first three months?

1 Answers   Petro Star Mount,


What are good characteristics of good combustion in a boiler?

0 Answers   RRB,


Hello there, Im a Mechanical Engineer. I passed out in 2010 and have worked for 6 months in the Middle East as a Trainee Engineer. Im now in India and due to appear for an Interview for a firm in the Middle East. The post is of an Automobile Engineer. Im kinda nervous as to what to prepare for the interview. The training which I got was in different areas ranging from technical to managerial aspects. What I mean to say is that that was more of a crash training, where I couldn't stick to one section alone. The interview which Im attending is more of a technical one. What I would like to know, how and what I should be preparing? I have two weeks for the preparation. Should I go through the normal automobile aspects or everything in random. PS: I have excellent communication skills, the one area in which I'm very confident.

0 Answers  


What type of pump is lubricator pump?

0 Answers   RRB,


At what principle Air Compressor Works?.. What are the rule governing air compressor operation:

2 Answers   DAE,


lim x tends to 0 sin4x/x

2 Answers  


How to calculate the HEAT RATE of a boiler and a HEAT RATE of a steam turbine ?

2 Answers   Bhushan Power Steel, MSP,


what is the advantage of high pressure boiler & what is effect on steam consumption?

1 Answers   Electrical,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)