Test Management:
The planning, estimating, monitoring and control of test
activities,typically carried out by a test manager.

Test Design (Specification):
A document specifying the test conditions(coverage items)
for a test item, the detailed test approach and the
associated high-level test cases.

Test Execution:
The process of running a test on the component or sustem
under test, producing actual result.

Test Plan:
A document describing the scope, approach,resources and
schedule of intended test activities. It identifies,
amongst others, test items, the features to be tested, the
testing tasks, who will do each task, the degree of tester
independence, the test environment,the test design
techniques, the entry and exit criteria to be used and the
rationale for their choice and any risk requiring
contigencey planning. It is a tecord of the test planning
process.

Test Specification:
A document that consists of a test design
specification ,test case specification and /or test
procedure specification.

Is This Answer Correct ?    12 Yes 1 No

Post New Answer

More Manual Testing Interview Questions

Just now i got a bug in the application.Anyone of u can clarify me is it a bug or not. scenario is: 1. if we a check box more than one. 2. click TAB and keep the focus on any check box not on the last check box 3. Then click (space+tab) at a time 4. then check the changes if we click anywhere the previous check box is going to be checked and the application is going to be hanged........... please answer to this question.If i have reported this to my developers they are telling that this is a browser property please confirm this scenario at ur developers and answer to me please .thanks in advance........ (glamorous)

2 Answers  


How will be the communication between the testers and developers while found a bug?

3 Answers  


As a tester, what is the final report u submitted to ur customer? please write it in tabular form?

1 Answers   CybAge,


what is regression testing???

7 Answers   Ness Technologies,


plese tel me,how to explain insurence project

1 Answers  






example for bug not reproducible

6 Answers  


1.Difference between System Testing and UAT 2.Difference between Load, Stress, Volume and Performance Testing. 3.Difference Between Integration testing and System Testing 4.Difference between Bug and Defect 5.Difference between Use Case and Test Case 6.Difference between Test Plan and Test Strategy 7.Difference between Test Scenario and Test Case 8.Difference between SRS and FRS 9.What are the difference b/w client & server? 10.explain test case template? 11.explain test plan template? 12.explain testing process? 13.explain bug report template? 14.what is scenario? 15.what is criteria?What are test entry and test exit criteria? 16.what is test strategy? 17.what is baseline? 18.what is hotfix? 19.what is Inspection,Walkthrough,Review,Audits 20.what is Stress Testing,Volume Testing,Sanity Testing 21.what is QA and QC? 22.Explain V-Model and Stages? What is Adv And DisAdv? 23.What is Boundary Value Analysis? 24.What is Equivalence Partitioning? 25.What is Error Guessing ? 26.What is Cause Effect Graphing techniques? 27.What is Bug , Defect and Error? 28.How will you report the bug? 29.What are the different test deliverables? Which deliverable we need to submit at the end of testing? 30.What methodologies have you used to develop test cases? 31.How you will close the defect? 32.What is meant by the bug state "Reproduce"? 33.What is change request?How do you handle change requests ? 34.what type of documents do u prepare during testing? 35.what are the testing methodologies? 36.What is release notes? 37.what is Response Time? 38.What report u generate after completing testing? 39.What is Test Bed? 40.Example for a bug having high severity and low priority? 41.Give me examples for high priority and low severity defects?

9 Answers   Nous,


Hi, This is vkram.I had completed my B.E in May 2005 & currently i am undergoing Testing Course. I want to join as a Fresher in any MNC. What should I tell why u r coming to testing field & what u did this 2 years?

0 Answers   iQuest,


difference Between Quality assurance and Quality control

7 Answers   EDS,


If someone had 2 months experience in manaul testing but not that much effetive knowledge then what he should do show experience or not in his C.V.

1 Answers  


You have been given 2 projects to test, what are the key factors you consider when prioritizing you work load?

1 Answers  


What is data persistancy?

2 Answers   Cognizant, CTS,


Categories