How to calculate electrical Induction motor heating and
cooling time constant,11KV,2850,12P,SCIM
Answers were Sorted based on User's Feedback
Answer / kn afridi
Heating and cooling time constants are generally given by the motor manufacturer.
This is the time required by the motor to reach 63.2% of its steady state temperature T when run with full load.
Heating time constant (t) is given by the formula (1-1/e) T= (1-1/2.718) T= 0.632T
If the steady temperature T attained by the motor is 90 degree C (say) when started from cold condition, the heating time constant in minutes will be the time required by the motor to reach 57 degree C. This can be noted during the heat run test on the motor under rated condition.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / thabo
A motor with a time constant of 120 minutes is rated at 40 kW continuously .compute the half hour rating for the same temperature if it starts from room temperature every time.
| Is This Answer Correct ? | 1 Yes | 0 No |
What is the difference of grounding and earthing?
In track electrification Either we use single conductor or double conductor? why?
What is Partial Discharge test .Please specify that this test can be test on 11/0.433 KV,630 KVA Transformer.
what is the basic difference between capacitor and condenser ?
What is the advantangeous over SFU (switch fuse Unit) & FsU (Fuse Switch unit) which one is better & application of Both?
What is the high tension lines voltage and low tension lines voltage?33 kv is high tension line or low tension.
what is the higest transmission voltage and generated voltage in india
What is the advantage of Neutral graunding transformer insted of Neutral graunding Resistance in generating station explain briefly.
what is the mechanical safety of DG ?
at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)
0 Answers Ebrahim Textile, Siemens,
Why Neutral Earthing pits and body earthing is interconnected
2. What are the parameters of EHT sub-station?
1 Answers APGenco, Blue Star, Enercon,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)