when the PFR (POWER FACTOR REGULATOR)change a step to
zero,one of the RCCB will triped off,is it the changing step
of this PFR effect the RCCB?
Answers were Sorted based on User's Feedback
what is a RCCB doing inside a PFR. Any way if a rccb trips
than it means there is a earth leakage.otherwise the wiring at
the PFR is wrong especially the neutral connections or the
RCCB itself is faulty. Check all the wirings first and than
try substituting the RCCB itself
| Is This Answer Correct ? | 0 Yes | 0 No |
what is a RCCB doing inside a PFR. Any way if a rccb trips
than it means there is a earth leakage.otherwise the wiring at
the PFR is wrong especially the neutral connections or the
RCCB itself is faulty. Check all the wirings first and than
try substituting the RCCB itself
| Is This Answer Correct ? | 0 Yes | 0 No |
What is OT in a transformer, specify its function.
write down the formula of cable size in RM if current is 50Amp.
which of the following is the earliest known literary source of ancient india and indeed of mankind
why noise occurn when transformer is working ?
resistance switching is used in case of- ? a. air blast CB b. bulk oil CB c. minimum oil CB d. all types of CB
what is the min and max ohmic resistance for the earthing rod installed for lighting poles for street light network
How to obtain B license from TNEB license board. What is eligibility?
You are of electrical field and you are going for software? Why
we have a 2.5hp Starite electric motor water pump,the elec motor burned out,we need to replace starting capacitor(old capacitor specs erased),what microfarad rating capacitor do we need? 110-125V
what is the working process of over & under voltage relay.
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
2. What are the parameters of EHT sub-station?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)