Answer / nilesh pawar
NEW
|
OPEN REJECTED
| |
|--------ASSIGN----------|
REOPEN | |
| TEST POSTPOND
| ----------|
VERIFIED
|
CLOSED
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sm
New -> Open -> In Progress ->Fix ->Test (Verify))->(Fail-
Reopen-Fix-Test)->Ready->Close
If tester verifes and Confirms that Bug is fixed , then Bug
is Ready and it will be closed once the product goes for
live.
If tester verifies and COnfirms tht bug is not yet fixed,
then bug is failed and reopened, then again fixed and goes
for test.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / chil4u
New(by test engineer)->Open(by developer)->Fix(by dev)-
>Close
New(by test engineer)->Open(by developer)->Reject(by dev if
he feels nto defect)Reopen(by t)->Retest(by t)->Open->Fix-
>Close
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / abhishek dubey
NEW > OPEN > ASSIGN TO DEVELOPER > FIX BY DEVELOPER > AGAIN
TEST BY TESTER > IF FIXED THEN CLOSED OTHER WISE REOPEN.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / akshay
what ll happen to the bug it is fixed ?????
as rajesh have made a flow chart after the bug is fixed it
will go to reopen . i dont know y it ll reopen if the bug is
already fixed ????
For first two stages i do agree with him but after that
..........naaaaaaaaa
well let me tell you if the bug is fixed it will go to the
tester for verification whether the bug has really been
fixed or not
i.e after fix------> Verify
and if the bug is not fixed then it ll go to reopen sate
when the bug is really fixed and the tester has verified it
then it will go to "close" state
Thanks
Akshay
mail me @ : akshay_bali2001@yahoo.co.in
Is This Answer Correct ? | 1 Yes | 1 No |
If we have 9 floor n 3 eggs n we have to check from which floor the egg wont get break.how can we do that
What is V-model and explain
which model are you following
Write the test cases for 2-way electric switch system. Write for GUI, functionality as well as stress testing
what type of problems faced with u'r team mates in u'r comapany?
1. what is the test prcoedure that your fallowing in ur organization ? 2.
what is testing methodology
Please explain software release process in detail.
How do ensure that we prepared Test cases for all the requiremets.. or how do we ensure that we didn't missed out any requirments...do we prepare any Tracebility matrix.. can anybody answer this question...
1.how you know all test cases are cover in one application? 2.what is difference between error message and warning message ? 3.what are the items comes under traceabily materix?
Want to write ISTQB foundation level exam on MAY. But not yet collect a proper book nor recent dumps.Please anyone can share with me recent dumps for 2011 syllabus.or any pdf.Please its a urgent request
which one is not the integration testing a )Big Bang b)Top-down c)Bottom-up 4) dot remember the 4 fourth option