Please nybody say, weather the result of Bharat Oman is
declared or not?
Probable date of declare???????
No Answer is Posted For this Question
Be the First to Post Answer
what is pole slip ?
Hi friends. is it possible that SCADA System through RTUs can connect Via PLCC Communication carriers ? thanks
why we multiply 11 in High Electric supply?(eg.11KV, 33Kv, 330Kv etc.)
what is scan time of PLC & in which factor scan time is decide
why full load voltage is less than no load voltage?
how the 12 pulse rectifier is made?
8 Answers Engineers India Limited,
what is meant by cbct elr?
Why we use modulus with voltage in stability equation that is P=[E][V]SIN@/X WHY VOLTAGE IS IN MODE VALUE WHAT IS THE REASON?
Now I inject 1kv DC supply r&y=??? R&Y=?? Y&B=?? B&R=???? RYB&N=??? RYBN&E=????? Minimum value====???????
how can get electrical "c" licence.i am complited in DEEE.PASSING YEAR OF 2010 I AM WORKING IN SPENCER PLAZA ELECTRICAL MAINTENANCE ,I AM DIPLOMA COMPLEATED IN ANDHRA PRADESH AND WORKING OF TN PLEASE HELP ME
Do you know how to measure the earth resistance? if so explain it
42 Answers ABB, BEL, BridgeStone, College School Exams Tests, Dalkia, Dalmia Group, DEC, Electrical, Genpact, HEC, IOCL, JLL, L&T, MSEB, Saraca, Sical, Telecommunications, University Exams,
What is negative sequence over voltage element?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)