What is the entry creteria and exit creteria for system
testing
Answers were Sorted based on User's Feedback
Answer / rajesh ahirrao
For System Testing,Entry Criteria is-
1) SRD(S/W Req.Docs)should be freezed.
2) All Test Case writting should be completed,review.
3) Unit testing,Integration testing phase should be
completed.
Exit Criteria is -
1) All High Priority & HIgh Severioty defects should be
closed( fixed).
2) Application should be worked as per User's expectation.
3) Application should be meet successfully all the Users
requirements. etc..
Please suggest me if I am wrong...
Thanks,
Rajesh Ahirrao - (Hyderabad).
ahirrao.rajesh@gmai.com
Is This Answer Correct ? | 15 Yes | 0 No |
Answer / harjeet kaur
Entry criteria for testing is as soon as SRS is prepared the
testing should be started. Exit criteria is decided by
either project manager or when the application starts
working normally.
Is This Answer Correct ? | 9 Yes | 3 No |
Answer / kiranmayi
Entry and Exit criteria are defined by the company.In
general:
The Entry criteria are:
• The SIT code and environment shakedown was
successfully completed and there will be no interruptions
to the system test as a result of either
• Successful completion of unit testing and
integration tesing in development environment
• Updated Change Control Logs
Exit criteria are:
• All Requirements that are In Scope have been met
and the severity 1&2 variances are resolved.
Let me know if any questions
bommi_ki@yahoo.ca
Is This Answer Correct ? | 1 Yes | 1 No |
What is your daily process? I have 2+EXP IN MANUAL TESTING.PLEASE SUGGEST ME HOW i ANSWER
What is data flow diagram?
What are different types of metrics used in testing ?
What is difference between Application testing and Web application testing??
what is deffered defect?
NOte pad Testing Q : How to test the notepad "Font size" and "Word Wrap" Options. How to test the relation between these two option.
what is BFSI DOMAIN? COULD U EXPLAIN EACH AND EVERY THING IN DETAIL?
Artifacts in design phase of SDLC ?
How can you report the defect using excel sheet?
What are the document required to prepare during testing?
Can you explain calibration in Testing?
When do you prepare Requirement Traceability Matrix(RTM) before testing aor after completion of testing?
14 Answers AppLabs, IEG, Satyam,