What is the entry creteria and exit creteria for system
testing
Answers were Sorted based on User's Feedback
Answer / rajesh ahirrao
For System Testing,Entry Criteria is-
1) SRD(S/W Req.Docs)should be freezed.
2) All Test Case writting should be completed,review.
3) Unit testing,Integration testing phase should be
completed.
Exit Criteria is -
1) All High Priority & HIgh Severioty defects should be
closed( fixed).
2) Application should be worked as per User's expectation.
3) Application should be meet successfully all the Users
requirements. etc..
Please suggest me if I am wrong...
Thanks,
Rajesh Ahirrao - (Hyderabad).
ahirrao.rajesh@gmai.com
| Is This Answer Correct ? | 15 Yes | 0 No |
Answer / harjeet kaur
Entry criteria for testing is as soon as SRS is prepared the
testing should be started. Exit criteria is decided by
either project manager or when the application starts
working normally.
| Is This Answer Correct ? | 9 Yes | 3 No |
Answer / kiranmayi
Entry and Exit criteria are defined by the company.In
general:
The Entry criteria are:
• The SIT code and environment shakedown was
successfully completed and there will be no interruptions
to the system test as a result of either
• Successful completion of unit testing and
integration tesing in development environment
• Updated Change Control Logs
Exit criteria are:
• All Requirements that are In Scope have been met
and the severity 1&2 variances are resolved.
Let me know if any questions
bommi_ki@yahoo.ca
| Is This Answer Correct ? | 1 Yes | 1 No |
we are about to implement a Test tool to test the performance of website, so what script does a tester should know (friends plz help me)
when will u make update and modify the test object properties in the repository?
What is testing ?
what is test data?how test data is prepared? are there any guidelines/methods to prepare it?
What is the first query u encounter to test a database..?
in what order should i answer for the question "tell me abt your self"
What is Traditional testing & Object Oriented testing?
exact definition of defect tracking?
Where you involve in testing life cycle ,what type of test you perform
What is stub and driver in integration testing ? Explain with example.
11 Answers Accenture, Taleem India,
Which type of testing combines two modules?
what is positive and negative testing with example?