Qa is quality assurance. the main responsibility of a QA member is to ensure
that the standards r followed and to develop the methods as to make the
software development process smooth and to prevent the bugs from ever
ocurring.
QC is quality control. the main responsibility of a QC member is to find the
bugs, find them as early as possible and make sure that they get fixed.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / k sridharan
Quality Asurance veryfy the all documents
Quality Control to check the application as per requiremant
QA done in pre_execution period
QC done in post_execution period
QA done by Quality Analiser
QC done by Tester
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / gaurav
Quality Assurance : A set of activities designed to ensure
that development and maintaince process is adequate to
ensure the system will its requirement. Qa is done by QA
member. Its to ensure that process is defined and
appropiate .QA rewie will focus on the process elements of
projects. Eg whwther req are defined at proper level or not.
Quality Control : A set of activities designed to evaluate
a developed work product. Focus on the Product oriented.
focus on finding defects in specific deliverables -e.g.,
are the defined requirements the right requirements
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / lokesh chauhan
Both above two answer are correct but in short we can say
Quality assurance is a verification phase while
Quality control is a validation phase.
Plz correct me if i m wrong...
Regards..
Lokesh Kumar Chauhan
lokesh_kumar_chauhan@yahoo.com
Mobile - 09350229669
Noida
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / siri
To say more clearly related to the answer posted by Lokesh
chauhan The verification phase includes information
gathering,Analysis,design and the coding
the validation phase includes system testing and maintenence.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / surii
Quality Assurance : It is a proces in which every role and
his responsibilities are monitored and guided in such a way
that he accomplishes the task as per guidelines and quality
standards to provide quality of the product at the end.
Quality assurance is also called as Verification.
Quality Control : It is a process in which inspections and
auditings performed on the roles and responsibilities to
segregate bad process and elements from good ones. It is a
one type of controlling process. Quality control is also
called as validation.
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / charjras surana
QA-Quality assurance is a planned and systematic pattern
for all action necessary to provide adequate confidence
that the item or product confirms to eshtablish technical
requirement.
QC-In the quality control we compares the product with
application standard is to ensure tha all quality
requirements are being met.
---- c.surana82@gmail.com(09986697771)
| Is This Answer Correct ? | 0 Yes | 1 No |
Who will excatly assign the priority to the bug.. ...
what are the documents required to stop the testing?
what are the base line documents for sit and uat? what is impact testing? what is dynamic testing? what is static testing? what is soak testing?
What r the 3 types of System testing
33 Answers College School Exams Tests, Misys,
what are things you want to check in web based testing?
Do you handle deployment? How?
You may be overqualified for this position we have to offer
How you will test media player ?
in sdlc process what is the rool of PM,TL,DEVELOPER,tester in each and every phase? pelese explain me in detail?
plz explain about tracebility matrix with example? thanks in advance
WHAT IS COMPATABILITY TESTING
Condition testing is a control structure testing technique where the criteria used to design test cases is that they Option 1 Rely on basis path testing Option 2 Exercise the logical conditions in a program module Option 3 Select test paths based on the locations and uses of variables Option 4 Focus on testing the validity of loop constructs