If a interviewer ask me the duration of my project, then
should i tell them the total(development+testing) time of
the project? Plz tell it's urgent
Answers were Sorted based on User's Feedback
Answer / reddy
No Actually nowadays every org.following V-Model so,we start
Devt n testing at same time we give ultimatly Dev+Testing.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / evelyn
Duration of a project will include both development and
testing time.B'coz at the time of development, tester will
not be passive. tester will be preparing test plans and
also some works will be planned to do the testing in more
efficient manner.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / narayana ch.
hi this narayana...
The project time means the total time taken for developing
as well as the taken for testing the project....
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / swapnil
hi this swapnil
no, as per u are a tester u only given a testing time 2
management not a developing n what a funtionality of
database u tell them a duration of ur testing skill.
is there any douts plz send me mail on mail id..
thankuuuuuuuuuuuuuuuuuuuuuu
Is This Answer Correct ? | 0 Yes | 0 No |
What was a problem you had in your previous assignment (testing if possible)? How did you resolve it? (eswar)
please make me understand what is client server and web application?
Hi, Can any one tel me what is meant by adhoc testing
How to write a mail to PM and Client regarding Bug status report.And how u r introducing your self to the client through mail.I want a format of both.
In Test Case Document, Expected Result and Verify are the same fields?
How do we run the Data Base Testing Manually
1. What is Validation and Verification? 2. What is Severity and Priority? Give an examples for: Severity High and Priority High Severity High and Priority low Severity low and Priority high Severity low and Priority low 3. What is Test Metrics? 4. What is Traceabily Matrix? 5. What is CAR in Cheque Remittance Project? 6.What are the tabs in the latest version of Test Director? 7.Explain Development "V" Model? 8.What will you do first when you are asked to start testing? 9.What will you do if you find a bug first time? Can i directly report to the developer? 10.Can you connect Load Runner to Test Director?
if the interviewer asked what are thec hallenges did u face in ur project how should we answer in project point of view and as well as testing technical point of view plzzz send the answer i faced this question lot of times but i am unable to expose correctly plz send the answer how to say plzzzzzzzzzzzzz
Hi, This is vkram.I had completed my B.E in May 2005 & currently i am undergoing Testing Course. I want to join as a Fresher in any MNC. What should I tell why u r coming to testing field & what u did this 2 years?
Suppose when you click on message icon in your mobile phone , if it is giving a message "Error,Message cannot be opened", Wha will u do? how do you rise a defect? /
I want Tracebility Matrix template, if any one have mail me at dada_khairnar@hotmail.com
what is verification, validation