When should u feel that u can stop testing now?
Answers were Sorted based on User's Feedback
Answer / techie
The following are few of the common Test Stop criteria:
- All the high priority bugs are fixed.
- The rate at which bugs are found is too small.
- The testing budget is exhausted.
- The project duration is completed.
- The risk in the project is under acceptable limit.
Practically, the decision of stopping testing is based on
the level of the risk acceptable to the management. As
testing is a never ending process, we can never assume that
100 % testing has been done, we can only minimize the risk
of shipping the product to client with testing done.
| Is This Answer Correct ? | 17 Yes | 0 No |
Answer / naga siva sankar
we can stop the testing by using the following factors:
1.If release deadlines or testing deadlines are reached.
2.Test cases are executed with certain percentage passed
3.Test budget depleted
4.Coverage of functionality reaches a specified point.
5.Bug rate falls below a certain level
6.Beta or alpha testing period ends
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / psrisusee
There are many facts involved for Stop testing.
It is decided based on the project risk.
the basic essence is "WE CAN STOP TESTING ONCE THE SYSTEM
MEETS IT'S REQUIREMENT"
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / krishna
Once Exit criteria met, we will verify there isno severity1
& 2 issues, may be we may have severity 3 & 4 defects
these things we will menction in clousure reports
before moving to next level of testing development have to
give the fixes for the respective defects
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sss
Really, testing stops when the Exit criteria (which is
decided during test planning) is met.
| Is This Answer Correct ? | 0 Yes | 0 No |
The team/I feel that 'stop testing now' in the following contexts,
1.When there does not exist any functional bug/defect
2.When Schedule or resource crunch occurs
3.when schedule reached as per the test plan
4.when new requirements are arising and supposed to make changes to test specifications.
5.When test environment needs an Update for newer version of software's or a Client requirement to change of environment
6.When new build of product under development is ready to test-version
7.When test requirement and aim/goal of the testing is achieved as per the test plan.
There may exist other reasons to as per the market requirements and trends in the development process.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / balakannan.p
Testing never ends,
Why because for every change of test environment,
bugs will come
| Is This Answer Correct ? | 3 Yes | 5 No |
Answer / minu
When almost all the test cases are executed and there are
no much big defects
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / chandu
1.when nearing to deadline
2.when all the major functionality covered
| Is This Answer Correct ? | 0 Yes | 4 No |
Answer / raju korti
*after executing all test cases
*after defliting the budget
*at the end of release date or testing dead line date.
| Is This Answer Correct ? | 1 Yes | 6 No |
Three types of tea the a,b,c costs Rs. 95/kg,100/kg and70/kg respectively.How many kgs of each should be blended to produce 100 kg of mixture worth Rs.90/kg, given that the raveled s of band c are equal...
2 Answers CTS, John Deere, TCS,
Do anybody have any idea about the testing tools related to client-server apllications( for banking application or products ).Kindly tell me both open source and licensed tools. Thanks in advanceRegards
what do u do when u enter at ur system till end of the day?
what is the entry & exit criteria of testing process?
6 Answers APC, MBT, Microsoft, Nortel, TCL,
write bug due for a web app in which a text field "phone number" which should allow only 10 numbers,but allows chars, special char and more than 10 numbers in to the field?
tell me tst cases for "RESUME"which is displayed on monitor
what is entry and exit criteria?
How would you test an ATM Machine?
I want appear the ISTQB fundation level in june '08. For this i require previous question sets or glossaries.pls email me if any one have previous question sets or glossaries. my mail id is- jayanta_bncoe@yahoo.com Thanks jayanta
wat r some of the first steps you will take in your role as a QA
What are the benefits of destructive testing?
I. Policymaker II. Technical specialist III. Project manager IV. Software development manager The personnel listed above represent a partial list of candidates for the configuration control board (CCB). In addition to software QA and software CM, which of these personnel should be included on the CCB? 1. II and IV 2. II 3. II and III 4. I and II 5. I, II, III, and IV