Answer / samratreddy
once defect was detected by the tester ,first he report
that bug to testlead with a status"new" and first
tester/testlead give the sevirity to the bug after sending
the bug to developers status which is "assign"they will
give the priority to the bug.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / satyaprasad
once defect was detected by the tester ,first he report
that Bug to testlead with a status NEW ,test lead will
revise that bug whether it is genuine bug or not .if it is
genuine then he assign priority and report that bug to the
developer with ASSIGN status
hi this is satya ,any doubts contact:9912418320
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / rahul
It depends upon the structure of your company. But as per
guidelines Priority of the bugs should be assigned by
Development team lead.
He prioritize them whom to be fixed first. For example: one
tester assign one work around defect and another tester
assigned critical defect then Development team lead will
prioritize whom to be fix first.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / rekha
Whoever opens the defect for the bug (tester) will assign
the priority depending on how it affects the project.
| Is This Answer Correct ? | 0 Yes | 4 No |
Explain Water fall Model
how many buils u r getting in u'r project?
5 Answers Professional Access,
Explain waterfall model????
so far how many bugs you have found?what are those means what should we answer for that?
Is there a way to estimate acceptance test cases in a system? What is a test suite?
How should you learn about problems discovered in the field, and what should you learn from those problems?
on what basis low,medium,high,critical will be assigned to a bug.give m examples
who prepare test plan?
hi friends , h r u all off uu ,,what is -ve , +ve test cases,what is differnce between both pls tell thanks advanceeeee
when developers sends you a build.what the test engineer does?
Hi frnz!! Can we do the Testing without writing Test Cases, but only posting the bugs in the BMS?
14 Answers HCL, JPMorgan Chase,
From which document we will get Technical Requirements ?