My interview is on 21/09/07.Kindly send me the Questions
and answers on 1)Inspection and testing of pumps &
compressor, 2)Piping 3) HVAC
Answers were Sorted based on User's Feedback
Answer / sankar
Inspection & testing of Pump are flow rate, Discharge rate &
Delivery Head.
Pips are -- Hydrodyanamic test.
Havc- don 't know
| Is This Answer Correct ? | 1 Yes | 3 No |
Hi any one can help in preparing for BHEL ET exam in mechanical stream? I like to know the the question paper pattern fro the same. regards, Jose 9841327666 josevinoth@yahoo.com
Can an airplane fly without a tail?
i am prepared for the rrb section engineer, please help me to guide , how to prepare and which books are good for technical, aptitude(arthimetic, resonning and g.k), send details to me by email: sudhakar.gudditi@gmail.com
have a clutchless car or bike clutch for power transmission???
Is there any problem occur in steam turbine if generator works as a motor?
fan having rotational motion why?
in a cylinder filled with any gas,if we attach two pressure gauges one at bottom and one is at top. will both pressure gauges have same reading???
After any cause of repaired how i start the engine by slow speed 800 to 900 rpm electronic control moudle engine [cummins]
Which type of impeller has highest speed Backward, Forward ,Straight?
Plz, send me last 5 years Question papers with answers of JE RRB.
how exact reduced the work done by compressor by use of intercooler?
what is STOCT TURN OVER RATIO
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)