My interview is on 21/09/07.Kindly send me the Questions
and answers on 1)Inspection and testing of pumps &
compressor, 2)Piping 3) HVAC
Answers were Sorted based on User's Feedback
Answer / sankar
Inspection & testing of Pump are flow rate, Discharge rate &
Delivery Head.
Pips are -- Hydrodyanamic test.
Havc- don 't know
| Is This Answer Correct ? | 1 Yes | 3 No |
• Do you consider yourself a leader?
1 Answers Petro Star Mount, Tech Mahindra,
If any machinery or trnsmission needs periodic and regular lubrication what is the best method to give?
sir, I am applied RRB chennai,for Section engineer (mechanical),Pls mail 2007,2007 & 2008 years solved question papers.My Mail Id:nathan_cs65@yahoo.com Thanking you
How to decide the thickness of sheet metal while designing the bracket?
Where can you find the feed check valve and feed stop valve and give the purpose of it?
variation of latent heat of vapourization with pressure.
what is meant by horse power(h.p)?
WHAT IS DENSITY OF AIR AND PETROL MIXTURE IN 2 STROKE S.I.ENGINE
types of pipes
13 Answers Ashok Leyland, Deloitte,
Explain the uses of windmill?
Define coal
Respected Sir, Please send me the technical question paper of ONGC.I am in urgent need of it.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)