My interview is on 21/09/07.Kindly send me the Questions
and answers on 1)Inspection and testing of pumps &
compressor, 2)Piping 3) HVAC
Answer Posted / sankar
Inspection & testing of Pump are flow rate, Discharge rate &
Delivery Head.
Pips are -- Hydrodyanamic test.
Havc- don 't know
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Give five reasons why a reciprocating pump will reduce capacity or pressure when delivering water
I am completed diploma in mechanical in 2002, i have 5year experience in materials (purchase) dept,i want to do SAP cource in MM module, i want to know can i complete SAP after diploma cource only, is it usefull to me for further Job opening.
What is meant by newtonion and non-newtonion fluids?
How many btu per hour equals 1 ton of air conditioning?
hi gys.. I too want sample papers of hpcl(mech) please help me......plz..... mail me dnaik2006@gmail.com
why we open open condenser vacume early when the unit get balck?
What is short cycling in refrigeration system?
where is the steam trap connected in boiler distribution?
Explain how does hydraulic clutches work?
Name the indicator diagram.
Which conducts heat faster steel copper or brass?
Which tools are used in fitting shop?
DURING STEAM BLOWING OF PIPE LINE, A BLUISH COLOR CONICAL PATTERN IS OBSERVED AT THE END OF PIPE. WHATS THE CONCEPT BEHIND IT?
How much is 1 kn in kg?
What is critical pressure ?. What will happen if water is heated above critical pressure and temperature?. What importance it is having related to Boiler?. Upto what presrure natural circulation is possible in Boilers?.