Answer / sr.ashok
Hi i am ashok from Perot Systems,
The Following are the Minimam Reqqirement to start testing
1. Receive build from development team
2. Reviewed testcases design document
3. Requirements of the customer
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / asn
The minimum requirements to start testing are
1).Test cases should be prepared and reviewed.
2).Testing environment should be ready.
3).Build should be released
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / test_bro
Following listed points should have been completed in order
to say go for testing:
1)Build has been received from development team &
configuration team has deployed it on QA box.
2)Test environment setup completed & test bed is prepared.
3)Tester has done his analysis on the clients requirement &
specification.
4)Test cases are reviewed completely.
| Is This Answer Correct ? | 4 Yes | 0 No |
Requirements documents
Test environment
Build
Test Plan
Here test cases are not THE essential elements to start
testing compared to the above mentioned items. In some cases
testing is done on the fly and at times some of the test
cases are even written after the initial build is given. A
tester can even perform ad-hoc testing to get a feel of the
application.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / n t
The minimum requirement to start testing:-
Build.
Test envirnoment.
Test Case.
| Is This Answer Correct ? | 4 Yes | 3 No |
Answer / premal matalia
Hi Anyone We have openings in Deloitte Mumbai for Testing
(Manual, Automation, Performance). If Anyone is interested
please send his/her resume on premal.matalia@gmail.com
Will refer his/her name for suitable requirements.
| Is This Answer Correct ? | 2 Yes | 2 No |
What are the qualities if the tester ?
Hi Friends .. Ans me these questions only on sqt.qae@gmail.com q-1)when testing will be stopped? q-2)same application program will run on a standalone workstation and on connected workstations.Describe what additional testing is require when workstation are connected?
Suppose,u have written 10 test cases for an application,but ur developer is not satisfied wht u wrote,then how will u justify him that ur test cases are correct?
What is the main use of the quality center comparing to the excel sheet?
What is the exact difference between smoke testing and sanity testing.?
What were your achievements in last 2 years as a software tester(manual)
by whom testing is done in waterfall model ,spiral model and prototype model? means is it done by testers or development team itself?
I have 2+ experience in manual testing but I can not use any bug tracking tool. I use excel sheet & mail that sheet to developer now I wan to change company is there any effect.
On which order testing is done regression,retesting,functional,User Acceptance Testing,Usability Testing,Smoke Testing ???
Why do you need to parameterize fields in your virtual user script?
why do testing are divided into stages primarily becoz: 1)different stage has different purpose 2)Stages makes the testing simpler 3)Different test run in different environments 4)The no of stages the testing is easier Please do answer its urgent
which of the following is not a coding defect? Option 1 Test harness defect Option 2 Data flow defect Option 3 Initialisation defect Option 4 Algorithmic defect