developers take most of the time for coding and tester left
very few time for testing say 2 days which testing u find
best when ur project is run out of time and product is
going to be released
Answers were Sorted based on User's Feedback
Answer / chandra sekhar manepalli
Adhoc Testing is correct.
It will be done by a senior tester when the testing team is
ran out of the time.
| Is This Answer Correct ? | 3 Yes | 0 No |
How we prepare the Requirement Traceability Matrix(RTM). Write the format please.
What is Entry Criteria & Exit Criteria
What is meant code review?
Hi, this is murthysharma. I need very urgently about some terms which are used in use cases? Plz give reply to me, if any body know, It is really very very urgent. 1. what is the difference between basic flow,exception flow and alternative flow? 2.what are non-functional requirements in use cases? 3.what are exceptions, special requirements, business rules, assumptions, constraints. Kindly give me with the example. Bcoz, I am very new to this use cases. thanks in Advance. Regards, M.MurthySharma
What is verification and validation testing
How to Generate Test Case for Shopping Cart?
define:usecase?
system testing or sub system testing ? both are same or different ?
can any help the difference b/w incremental integration testing & integration testing & system & funtional testing
diff b/w waterfallmodel & v-model?
if i give some thousand tests to execute in 2 days what do u do?
24 Answers BirlaSoft, Sigma IT,
As a tester, what is the final report u submitted to ur customer? please write it in tabular form?