Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Consider if there is no Test lead, No Test Manager and QA
Manager. If you are the senior test engineer, you are
getting pressure from the client to give the build. But you
see that, there r 5 high and 5 low sevierity bugs. So, what
you will do and how you interact with the client.

Answers were Sorted based on User's Feedback



Consider if there is no Test lead, No Test Manager and QA Manager. If you are the senior test engi..

Answer / pranab panda

Hi
If we are using Test director and the client is accessing it
then he can easily know the bugs(High or Low priority) from
the Test director only.
He will directly ask the developer since tester has nothing
to do with bug fixing.
If the bugs are maintained in Excel sheets(Offline) and
If the client asks for the build better discuss with the
developer and inform their view to the client.

Is This Answer Correct ?    0 Yes 1 No

Consider if there is no Test lead, No Test Manager and QA Manager. If you are the senior test engi..

Answer / sreenu

Depending upon severity we will decide shall we close the
project or not?If the budgs high severity we donot close
project.IF the bugs are not giving any problems to the
client so we will give it for release

Is This Answer Correct ?    0 Yes 1 No

Consider if there is no Test lead, No Test Manager and QA Manager. If you are the senior test engi..

Answer / software_testing_pune

The best way in this situation is to mention the bugs which
are assosicated with the build in document called "Known
Issues".

--- Reply me if i am wrong..:-)

Is This Answer Correct ?    0 Yes 2 No

Consider if there is no Test lead, No Test Manager and QA Manager. If you are the senior test engi..

Answer / rachana

First, I will try to convinience the client to give the
time to fix all the bugs. If he is not convienced with my
idea, mean time I will fix the low priority bugs. By the
end of the discussion, I will show him the fixed bugs. By
showing these, I will try convience him to fix the high
priority bugs. If not, I will tell the client that the
application will not be the bug free.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Manual Testing Interview Questions

what is stub and driver ?explane in brife.,and some example

6 Answers  


can anybody tell me what is release process of company? release note?

0 Answers  


In our project, we use Withdrawal Indent, we are confused to use heading as "Withdrawal Indent" or "Withdraw Indent". Please suggest me which one to use ASAP, Thanks in advance

0 Answers  


What is Forward and Backward compatibility? How will you write test cases for compatibility testing?

1 Answers  


In which stage more defects found means anlaysis,design,coding,testing and maintance?

4 Answers   Accenture,


what is accessibility testing?

1 Answers   Sapient, Valtech,


What if requirement document is unclear?

5 Answers   PCS,


What is TRR ?

3 Answers   Covansys,


WHAt is diff between test plan and test planning?

5 Answers  


what is the test strategy you followed in your company

3 Answers   Infosys, TCS,


what is the main difference between high and low level design in sdlc

11 Answers   Accenture, Infosys,


Guys, can any one of u give the realtime example for Acceptance Testing

2 Answers   Wipro,


Categories