What is a feasibility study?
No Answer is Posted For this Question
Be the First to Post Answer
What will happen if we rotate the horizontal plane in anti-clock wise instead of clock wise and make the drawings in 2nd and 4th quadrant?Why the horizontal plane always rotates in clock wise?
hi,i am aneesh i want to know that ,presently i am in second year shall i go learning catia course in 4th semester and shall i have a training visit to industry after 4th semester,is it suitable for me and appropriate time to do so.
Is There Any guy give me detail information regarding "ISO/TS-16949-2002 " /TPM/QMS/SPC/MSA ???
HOW CAN WE FIND BEARING DIAMENSIONS BY ITS NUMBER
1 Answers Jindal, JSE, JSW, Nalwa Steel and Power, NTPC,
which type of que can be asked in this company?
What ill be the shaft diameter with clearance having a bearing bore is 30mm?
What is WPS
what will happen when generator shaft rotates in counter clockwise direction?
What does 0.125 inch stand for in 0.125 inch npt thread?
what is an function of air cell bag in air cell conservator
defination of vibration
In 9E frame of gas turbine how many MW is used