I have 100 records in source table, but I want to load 1, 5,10,15,20…..100 into target table. How can I do this? Explain in detailed mapping flow.
No Answer is Posted For this Question
Be the First to Post Answer
what is target load plan
following source name gender ramya female ram male deesha female david male kumar male i want the target male female ram ramya david deesha kumar any body give solution above question?
What is the need of an ETL tool?
How to extract original records at one target & Duplicate records at one target? {with out using EXPRESION transformation and sequence generator transformation?}<-this is important
Differentiate between Load Manager and DTM?
Can we make worklet inside worklet?
How you can differentiate between connected lookup and unconnected lookup?
What are the different lookup cache(s)?
Can one use mapping parameter or variables created in one mapping into any other reusable transformation?
What are the disadvantages of Sequence Generator T/R?
Design time, run time. If you don't create parameter what will happen
After draging the ports of three sources(sql server,oracle,informix) to a single source qualifier, can you map these three ports directly to target?