Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


it takes 8 , 12 and 16 days for A , B and C to complete to
task . how many days will it take if A works on the job for
2 days and then B works on it until 25 % of the job is left
for C to do , and C completes the work ?

Answers were Sorted based on User's Feedback



it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / sabarish

12 days.

work done by A in 1 day = 1/8.
for 2 days its 1/4.
remaining work is 1-1/4=3/4.

25 % of work is done atlast be C.
thrfore it is 1/4.

work done by B = 3/4-1/4 = 1/2.
days for B to complete is (1/2) /(1/12) = 6

days for C to complete 1/4 of the job (1/4) /(1/16) = 4.


A takes 2 days , B takes 6 days and C takes 4 days.
total is 12 days.

Is This Answer Correct ?    50 Yes 1 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / ramesh

12 days(100% sure ans)

Is This Answer Correct ?    16 Yes 3 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / himanshu

Que is in how many days total work is completed
A. 8day
B. 12 day
C. 16 day
Total work 48
A. 6 unit per day
B. 4 unit per day
C. 3 unit per day
A works for 2 day =12
B works untill 25% of work completed so 48×25%=12 and that mean C works for 12
So A +C = 12+12=24
SO
Remaining is 24
B =24/4 =6
So at last A work for 2 day B work for 6 day and C works for 4 Day total 12 days

Is This Answer Correct ?    1 Yes 1 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / gunasekar

for A, 2 days.
for B is =25% job left for C
i.e= 4 days
for c =0 days
the total days are: 6

Is This Answer Correct ?    1 Yes 11 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / saranya

C = 25 1/2days (c will completes the work.)

Is This Answer Correct ?    0 Yes 10 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / ritu

it will take 18 days to complete the work.

Is This Answer Correct ?    2 Yes 16 No

Post New Answer

More General Aptitude Interview Questions

At 6'o clock clock ticks 6 times. The time between first and last ticks was 30sec. How much time it takes at 12'o clock.

8 Answers   IBM, Mascot,


In a flight of 600 km, an aircraft was slowed down due to bad weather. Its average speed for the trip was reduced by 200 km/hr and the time of flight increased by 30 minutes. The duration of the fligh is?

1 Answers  


Sita is my father's father's only son's daugther. wat relation do sita and i share ? sister brother father mother

6 Answers   Amdocs,


A fuel dealer mixes two brands of fuel which cost in the ratio 2:3 A solution of 30% Brand A with Brand B yields profit of 10% when sold at RS 297. What is cost of brand B?

0 Answers   Mecon,


The LCM of two numbers is 24. The GCF is 4. One number is 4 more than the other. What are the numbers.

6 Answers  


A hollow cube of size 5 cm is taken, with a thickness of 1 cm. It is made of smaller cubes of size 1 cm. If 4 faces of the outer surface of the cube are painted, totally how many faces of the smaller cubes remain unpainted?

4 Answers  


The three boxes 1,2,3 has values resp. AB,BC,AC Get 2A(B+C) +AC-2C(A-B)in Box 1 using only addition in 3 steps.

5 Answers   Godrej,


A person's salary is getting reduced by 20%. What percentage should be added to get back his original salary?

2 Answers   Hexaware,


If 2*8 = 4, 3*15 = 5, 4*24 = 6, then 5*40 =?

1 Answers   Aricent,


5.A and B invest Rs.200 and Rs.300 respectively in a business for a period of 3 years, respectively. Then the profit will be divided in the ratio

2 Answers   BirlaSoft,


how much accuracy is required to get selected in ssc ldc

1 Answers  


The original fort in Bangalore was built in the 16th century. Later on, it was subject to the authority of the Marathas and then the Mughals. Who amongst them bought Bangalore in the 17th century from the Mghals for three lakhs?

3 Answers   RRB,


Categories