What is the major risk or challenge faced by you as QA
analyst other than clash with the developer regarding the
defect log.
Answer / tester24
To check out the project when it was not completed and the
despatch date is on door.
Regards
Jaglan
Is This Answer Correct ? | 1 Yes | 1 No |
Best institute for protocol testing in Hyderabad ? How will be the market for protocol testing ?
What are the emerging trends in the testing and QA arena?
An input field takes the year of birth between 1900 and 2004 what the boundary values for testing this field are?
Hi can anyone guide me regarding how the interview procedures will be in exterro Inc, Coimbatore
What is assertion testing?
Why we need localization testing?
During which test activity could fault be found most cost-effectively?
What are different types of protocols used in transportation and session layers of SAN?
What the difference between latent and masked defects is?
What is big-bang strategy?
What is the difference between interoperability and compatibility testing with some examples?
How to track the requirement from bugzilla tools? As our project requirement are changing frequestly and all are tracked in bugzilla tool. How to manage all as all project having short term duration. Please reply back ASAP? Thanks in advanced?