What is the purpose of cost accounting?
No Answer is Posted For this Question
Be the First to Post Answer
Why more than one purchase organizations are assigned to one plant?
what is fixed bearing?
What is the difference between productivity and productive system?
Share with us about a time when you had to present a proposal to a person of higher position and were able to do it successfully?
What is process planning? Mention different type of processes.
Difine the process you would establish to monitor the effectiveness of an emergency evacuation system
Difference between chopper and dbr?
what is the need of rectifier?
Mention different type of processes?
Let’s say we live in a country that gets very cold, in Northern America / Europe. In winter, we monitor the ouside temperature, so that heaters can be switched on, inside the house. The idea is that, the colder it is outside, the warmer it should be inside. The heating side of things is just a heater that is either switched on, or switched off. Just from the information that has been given, please discuss this matter in depth. Provide reference to OPEN / CLOSED loop control, FEEDFORWARD / FEEDBACK control and MODULATING / ON_OFF control raised in the discussion.
why power contactor using in DG set's neutral which is using as a stand by load during government electricity shutdown?
How improvements can be made for designing the parts?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)